Framing words, in plain English
Every trade has its shorthand. Here is what a NYC framer means by each term, without the jargon.
- Custom framer
- Someone who designs and builds a frame around one particular piece, instead of fitting it to a stock size.
- Design consultation
- Sitting down with the framer, the art and a few samples to settle the frame, mat and glass.
- Moulding
- The shaped wood or metal a frame is cut from. Its width, depth and finish set the look of the border.
- Mat
- The board with a window cut around the art. It gives the picture room and keeps it off the glass.
- Glazing
- The glass or acrylic in front of the art. Ask whether it filters UV light and cuts glare.
- Mounting
- How the art is held inside the frame. You never see it, but it decides whether the piece can come out again unharmed.
- Reversible mounting
- Hinges and supports that can be removed later without leaving a mark on the art. Nothing is glued down.
- Conservation framing
- Framing with acid-free boards, UV-filtering glass and reversible mounting, to slow fading and staining. It protects the art; it can't stop age.
- Acid-free
- Mat and backing board that won't yellow or stain the paper it touches over the years.
- Spacer
- A thin strip hidden under the frame lip that holds the glass off the art when there's no mat.
- Work order
- The written plan for your frame: materials, sizes, the ready date and pickup or delivery. Keep a copy.
- Condition note
- A note on your receipt of any tears, folds or stains the piece already had when you dropped it off.
- In-house workshop
- When the shop builds frames in its own workshop, so the person who designs your frame can talk to the people building it.
- Rush service
- Finishing a frame faster than standard, usually for an extra fee. Ask for the exact ready date.
- Installation
- Hanging the finished frame on your wall with the right hardware. It's a separate job from delivery.
- Certificate of insurance
- Paperwork many co-ops, condos and office buildings ask for before anyone hangs art inside. Ask your building what it needs.